E3 Lithium Completes Production Test on First Well to Positive Results – QNT Press Release


CALGARY, AB, Oct. 27, 2022 /CNW/ – E3 LITHIUM LTD. (TSXV:ETL) (FSE: OW3) (OTCQX:EEMMF), Alberta’s leading lithium developer and extraction technology innovator is pleased to announce it has completed the production test on its first well in the Clearwater Project Area within the Bashaw District.

The purpose of the test is to confirm the producibility of the lithium-rich brine from E3 Lithium’s (E3) resource located in the Leduc Reservoir. The production test, which included flowing 400m3/d of brine to surface for five days, has provided E3 with important data to support the commercial viability of producing lithium from the Leduc Reservoir.

The test also included reinjecting the brine back into the reservoir to confirm injectivity capacity, which is a cornerstone of E3’s environmentally sustainable process. The test included re-injecting the produced brine in less than …

Full story available on Benzinga.com



Source link

Recommended For You

About the Author: News Center